
Rental unit renovation in North York
For vacant North York rentals, we agree on kitchen and bathroom work, floors, wall repairs, paint and trim as one unit job.
A vacant unit between occupants
A rental unit can need work across every room even when the layout stays the same.
MRG is a general contractor for unit renovations, with demolition and removal, flooring, kitchen and bathroom work, drywall repairs, paint and trim in one itemised scope.
Tell us when the unit will be available and who can approve the room list.
A date for the next occupant helps establish the target, but it does not replace checking the work and material timing.
List any possessions still inside and who is responsible for clearing them before renovation access begins.
If the kitchen cabinets stay, identify which doors or drawers need attention instead of describing the whole kitchen as a replacement.
A room-by-room list makes the retained items visible alongside the new work.

Keep a finish standard for the unit
Send product names and colour codes when the unit needs to match other homes in the building.
Send baseboard profiles, flooring products and countertop choices with the room list before the materials are ordered.
Tell us whether spare material is already stored on site and what quantity is available.
A few spare planks might cover a repair but do not establish enough material for a connected hallway.
We check the thresholds and door clearances as part of the unit, including bathroom entrances and closet floors.
Wall repairs need to be recorded before painting, especially behind removed cabinets or where old fittings left holes.
If a stain comes from a leak, the cause and the dry condition of the wall need attention before the new finish closes it in.
The quote describes the visible work and any extra work needs an agreed change.
Working while neighbours remain in the building
An empty unit still shares corridors, elevators and entrances with occupied homes.
MRG agrees work hours, elevator use and corridor protection with the building before starting.
Send the loading route, the water shutoff procedure and any booking forms with the request.
Materials coming in and debris going out need access within those building hours.
Toronto does not accept cabinets, drywall, tile and other listed renovation waste in its oversized curbside collection.
Write the removal route and disposal requirements into the renovation work.
A building garbage room is not an assumed disposal route for the old kitchen.
For a condo rental, the owner also needs to address the corporation's renovation approval process before work is booked.
Source: City of Toronto, oversized items and renovation waste
The scope and handover
- Room quantities
- Include unit size and the number of bathrooms, with separate notes for closets and halls that need the same finishes.
- Approval contact
- Name the person who agrees the work and changes, especially if the owner and building manager are different people.
- Written changes
- Extra work is recorded and agreed before it is done, including damage found after old finishes have been removed.
- Walkthrough
- The unit handover includes a walkthrough and a list of anything left to correct, with finished photos available for the unit file.
Related work and North York access
Local sources
- City of Toronto, oversized items and renovation waste
- Condominium Authority of Ontario, condo renovations
Sources checked on 15 November 2026.
Questions about rental unit renovation
What should be listed for work between occupants?
A rental unit can need work across every room even when the layout stays the same.
MRG is a general contractor for unit renovations, with demolition and removal, flooring, kitchen and bathroom work, drywall repairs, paint and trim in one itemised scope.
Tell us when the unit will be available and who can approve the room list.
Can the request use an existing finish standard?
Send product names and colour codes when the unit needs to match other homes in the building.
Send baseboard profiles, flooring products and countertop choices with the room list before the materials are ordered.
Tell us whether spare material is already stored on site and what quantity is available.
What building details matter while neighbouring units remain occupied?
An empty unit still shares corridors, elevators and entrances with occupied homes.
MRG agrees work hours, elevator use and corridor protection with the building before starting.
Send the loading route, the water shutoff procedure and any booking forms with the request.
Source: City of Toronto, oversized items and renovation waste
Tell us which rooms are changing
Send the room list, the address and what you want to keep for a written renovation scope.